Abstract
The Block V is a modernized TACTOM missile which includes the Navigation / Communications (NAV/COMMs) upgrade. NAV/COMMs is a title replacement for Anti-Access, Area Denial (A2AD). Funds support development of the Tomahawk Weapons System (TWS) encompassing Tactical Tomahawk upgrades including baseline improvements into the Block V missile All-Up Round (AUR), Tactical Tomahawk Weapons Controls System (TTWCS), Theater Mission Planning Center (TMPC) upgrades and other missile system improvements to maintain pace with threats. The TWS provides a long range cruise missile attack capability against fixed and mobile targets. Tomahawk is capable of being deployed from both submarines and surface ships and significantly increases the total capability of joint forces. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under Operational Systems Development because it includes development efforts to upgrade systems that have been fielded or have received approval for Full Rate Production (FRP) and anticipate funding in the current or subsequent fiscal year.
Document Details
- Document Type
- R2 Budgetary Justification
- Publication Date
- Oct 01, 2021
- Source ID
- 0204229N_7_1319_PB_2021
- Change Summary Explanation
- Financial: The FY 2021 budget increased by $1.058M to account for program and miscellaneous adjustments. Technical: Not applicable Schedule: PU 4032: NAV/COMMS Operational Test moved from 3Q FY2020 to 1Q FY2021 due to efforts required to comply with the provisions of section 1634 of the 2018 National Defense Authorization Act NAV/COMMS Modernization Blk IV (Block V) Fleet Release moved from 4Q FY2020 to 2Q FY2021 NAV/COMMS Functional Ground Test moved from 3QFY2019 to 4QFY2019 NAV/COMMS LRIP Kit Award Lot-2 moved from 1Q FY2020 to 2Q FY2020 NAV/COMMS Production Deliveries moved from 1Q FY2020 through 4Q FY2024 to 1Q FY2020 through 4Q FY2025 PU 4033: Previous enacted budgets have resulted in M-Code program elongation. For M-Code Increment I Milestone B (conducted 4Q2019), RDTE funds were re-phased enabling the M-Code program to be fully funded and executable. Milestone B moved from 3Q FY2019 to 4Q FY2019 Milestone C moved from 1Q FY2023 to 2Q FY2023 M-Code PDR moved from 2Q FY2020 to 3Q FY2020 M-Code CDR moved from 4Q FY2020 to 2Q FY2021 M-Code DT moved from 3Q FY2020 through 1Q FY2023 to 2Q FY2021 through 1Q FY2023 M-Code OT moved from 2Q FY2023 through 4Q FY2024 to 3Q FY2023 through 4Q FY2025 M-Code EMD Award Phase I removed M-Code EMD Award Phase II removed M-Code EMD Award added M-Code Lot-1 moved from 1Q FY2023 to 2Q FY2023 M-Code Lot-2 moved from 1Q FY2024 to 2Q FY2024 PU 4034: Previous enacted budgets, as well as efforts associated with complying with the provisions of section 1634 of the 2018 National Defense Authorization Act, have driven significant changes to the program schedule. In order to provide greater clarity, the program's schedule as depicted in the R-4 has been re-designed, making line item comparisons unfeasible. PU 4035: Previous enacted budgets have resulted in JMEWS program elongation. Re-planning due to enacted budgets moved JMEWS Milestone B to 2Q FY2020. RDTE funds were re-phased enabling JMEWS program to be fully funded and executable. Milestone B moved from 4Q FY2019 to 2Q FY2020 Milestone C moved from 1Q FY2024 to 4Q FY2024 JMEWS TTWCS SW Dev moved from 1Q FY2020 through 4Q FY2024 to 3Q FY2020 through 4Q FY2025 JMEWS Fuze Risk Reduction moved from 3Q FY2018 through 4Q FY2019 to 1Q FY2019 through 1Q FY2021 JMEWS Warhead, Fuze, Target Design Integration removed JMEWS PDR moved from 3Q FY2020 to 2Q FY2021 JMEWS CDR moved from 2Q FY2021 to 2Q FY2022 JMEWS DT moved from 2Q FY2021 through 4Q FY2023 to 2Q FY2023 through 2Q FY2024 JMEWS OT removed JMEWS EMD Contract Award moved from 4Q FY2019 to 2Q FY2020 JMEWS Long-Lead Energetics Award moved from 1Q FY2024 to 4Q FY2023 PU 4036: Moved TMPC 6.0 IOC from 4Q FY2020 to 2Q FY2021 to align with NAV/COMMS IOC Extend the TMPC 6.0 PAT & DT/OT end date from 4Q FY2020 to 2Q FY2021 Moved TMPC 7.0 IOC from 4Q FY2022 to 4Q FY2023 to align with MST IOC Moved TMPC 7.0 SW Dev & Integration end date from 4Q FY2021 to 4Q FY2022 Moved TMPC 7.0 PAT & DT/OT end date from 4Q FY2022 to 4Q FY2023 Extend the TMPC 8.0 Requirements definition end date from 4Q FY2020 to 4Q FY2021. Extend the TMPC 8.0 Software Development & Integration end date from 1Q FY2024 to 4Q FY2024 TMPC 8.0 PAT & DT/OT moved from 2Q FY2024 through 4Q FY2024 to 1Q FY2025 through 4Q FY2025 Added TTWCS v5.6 IOC to 2Q FY2021 Added TTWCS v5.6.1 IOC to 4Q FY2023 Added TTWCS v5.7 IOC to 4Q FY2025 Added TTWCS v5.7 SW Dev&Int to 1Q FY2022 through 3Q FY2024 Added TTWCS v5.7 Candidate Dev to 4Q FY2019 through 4Q FY2021
- Service Agency Name
- Navy
Entities
Organizations
- United States Navy
Related Documents
- Child Project: NAV/COMMS
- Child Accomplishment: Navigation/Communications
- Child Cost Item: 14584d215f0e0c9fbaf6bb60eac4e5f4
- Child Cost Item: f73b37f66260aaea63695e4439f345d8
- Child Cost Item: ea6f0541cd1a0334487ab4bf7f49407c
- Child Cost Item: 3a51e33f8bdfadfbba3d681f3d715eb3
- Child Cost Item: 30353aee8a261e533c73d96c57588382
- Child Cost Item: ccf54e4da033578d48ea1b8bce45f40d
- Child Cost Item: a18d4777322488f10ad7c26346645826
- Child Cost Item: 678034d7ad9aeca8fc9cf2c3bdbf9041
- Child Cost Item: b49808f7477bddda27a00891445b929f
- Child Cost Item: f2d6aa0171830e5168af39edcd19a5f6
- Child Cost Item: 6a9fa92299e0df7cd40090258dc64c93
- Child Project: M-Code
- Child Accomplishment: M-Code
- Child Cost Item: fa47141deeea9828c82cdbad7ee90702
- Child Cost Item: 617757b116cef60ffa4d4ed95be75725
- Child Cost Item: 985f63a2ceaeeac0116d48ca2d3c34b0
- Child Cost Item: 112faeddb8282483ca7bc9c3c178bc71
- Child Cost Item: bbf3f38c2ef3b392301bdb7ee224f9c6
- Child Cost Item: 5a79dff32fae76e73db64e03a92f397b
- Child Cost Item: 0d352b77da096a06ce2a350940e5aee1
- Child Cost Item: 5f877c3060129350937a04e9f8557210
- Child Cost Item: 518488da635b57290fef9d21a9b11237
- Child Cost Item: 1c5ad19474a6dee326a5607ab3b94bb8
- Child Cost Item: b1e636395f1095587c9a7a829e825e98
- Child Cost Item: 531b7cfe284bcc4d2fcf8668792f65b7
- Child Cost Item: 517a0cf51c34c1636594ac9f5446ea32
- Child Cost Item: d26af58d0cc4735aeba1218a0a40ddde
- Child Cost Item: 964e5d3dcb255ce249aff05cfddfbdc1
- Child Project: Maritime Strike
- Child Accomplishment: Maritime Strike Tomahawk
- Child Cost Item: c8deeb85ae013c551a35ce9df0f33f04
- Child Cost Item: 85e7dbfbe92d2c867dd4ebb90fe667cf
- Child Cost Item: 6f6c515a64af5dc19a80b5cc6884ff0d
- Child Cost Item: 798234e86d6d53d321a31687354c64c3
- Child Cost Item: 2b690cc0331ebd26c390876998a12c72
- Child Cost Item: bcd3809b6ee98198ba1bf90385c21f3b
- Child Cost Item: 32c4cf8f47a80388a2b28b4db63afda4
- Child Cost Item: b41beb5c14c9e9e6843eb447b4e84739
- Child Cost Item: a2b9ceaf85d59188d8cd4504c3680d23
- Child Cost Item: a4c1228793ffc12ef5649ed24344b14a
- Child Cost Item: 44067fb8ce1d8043302cb76539d7174c
- Child Cost Item: e002421728e9e2105d39162c3c886b24
- Child Cost Item: 94035074c85643f6a5510084b6ed88c0
- Child Cost Item: 64ae01f6354b8c4d2f2872003f1d2fdd
- Child Cost Item: e1bdb94f6a98c64d834202821e9bafa5
- Child Cost Item: 917ee9688079360d09e58b893214a7b0
- Child Cost Item: 3cc01a731b25a15f7fc82d6bb61cfaa5
- Child Cost Item: 7d4cff06e6b062eab01c11ccea8b98d4
- Child Cost Item: a8781bd27d5e96e9cd039fd7ee600ed4
- Child Cost Item: 9858f052f0a2a5a77d5c48363984ad21
- Child Cost Item: f4e30eafccdb6f5725803bd087cab049
- Child Project: JMEWS
- Child Accomplishment: JMEWS
- Child Cost Item: 22aea51741cc750dfd519d829aa11f20
- Child Cost Item: b8385c1679336eb827f53c73369fac4c
- Child Cost Item: d2aec280314d30e6396358886e17caa9
- Child Cost Item: 6477735531532d8f8a179602178c2400
- Child Cost Item: be796ce4d2a8fb9e4ce4f3cf005d666b
- Child Cost Item: d159068a20b2f391d8545ac520f4384c
- Child Cost Item: baff17c940969e521e297961e85d0c29
- Child Cost Item: ad80247d663a75b5805bacbe44072e7e
- Child Cost Item: bc4f3b0735b1d20ece65abc0e309282e
- Child Cost Item: 252a890cca635acecc8bbe7411612b4a
- Child Cost Item: bc22d4cb2834bdb669f0641b141b0ea7
- Child Cost Item: a46de0e5fe24288f3e5c6744ffe0996b
- Child Cost Item: 9425fa46aca510053cdef12b30827b18
- Child Cost Item: dcca1adb489a249b3d6d37f643de9a70
- Child Project: TTWCS TMPC PPPI
- Child Accomplishment: Theater Mission Planning Center (TMPC)
- Child Accomplishment: Tactical Tomahawk Weapons Control System (TTWCS)
- Child Cost Item: f89b48941ddb98c78f90131a5d8c5b43
- Child Cost Item: 50c0d39aaf67c298794ace600d4fa0ae
- Child Cost Item: 91a2da226c13e11758e2440a030d04ce
- Child Cost Item: a08f350694d931e380872354fd97bd88
- Child Cost Item: e794af934c2e4df04373e766e2663811
- Child Cost Item: 65650997dd077096f0a9bbdad51bdb7a
- Child Cost Item: 1d99800d7004ec5f252b3e7109d74261
- Child Cost Item: 19520797ed9440539598a2270af2dec4
- Child Cost Item: 093249c1738dc1f4724427b0e563d191
- Child Cost Item: 27c244e2fc07066710c71cafb65a8ed4
- Child Cost Item: ad56a9b98e048ba8bf6ca830435ed087
- Child Cost Item: 9e3c6e022d6c95f5dfc190b335e90d85
- Child Cost Item: fce5dd303a42de73cb047bf8cda549d1
- Child Cost Item: 2d28558982ecd16c855def9f72393c60
- Child Cost Item: 542f55d4a1d4c89c6a322511c3325e50
- Child Cost Item: 178c1e9b253635be0ab549a9c5a6335f
- Child Cost Item: 2c917fb269f79076b40c05fee6dd0a58
- Child Cost Item: b42ba52de7c2f37c054b28f24e49136f